2. Wazzaneh Pumping Station in the south of Lebanon supplying domestic water to more than 30 villages. It consists of the spring side and the pumping station. The spring side pumps the water from Wazzaneh River towards the pumping station, and then the water is pumped to Markaba reservoir and Taybe project.

Main equipment supplied, assembled, and installed:
- 2 nos. 250 KW horizontal multistage centrifugal pumps (The spring side)
- 5 nos. 250 KW horizontal multistage centrifugal pumps each reaching 40 Bars pressure (main pumping station)
- Soft Starter Control panels incorporating PLC's, and automatic transfer switches
- Water Hammer System
- Water and Electromagnetic Flow meters
- Chlorination system
- Valves
- Distribution pipes